Baselining Differences |
PROIV Assure |
To perform a Baseline, which replaces all Recordings in the selected Test or the Suite, with Recordings of the Live Session in the last Test Run, follow these steps:
Open the Tests view or the Suites view.
Select the relevant Test or Suite on the left hand pane.
Click on the Baseline icon.
A warning message appears:
"Baselining will replace all recordings in this test.
Proceed with baseline?"
If you attempt to baseline a Test that has not been run since the last Baseline process, the following message appears:
"Test "xx" baselined subsequent to last run.
A new run must be done before the Test can be baselined."
If the Baseline process is successful, the following message appears:
"Baselining complete"
Topic ID: 780043